San Marcos Design Manual (March 16, 2021)
B
A PP E ND I X
Streetscape Improvements
V. Comanche St (Hutchison to MLK) 41’-21’
W. Concho St (50-54’)-30’
general Right of Way
general Right of Way
50 - 54’
A
41’
A
Motorist Operating Speed 25 mph Walkway Sidewalk Bikeway N/A Parking
Motorist Operating Speed 25 mph Walkway Sidewalk Bikeway
Shared Travel Lane
Parallel (north side)
Parking
N/A
Planting
Tree Grate / Tree Lawn
Planting
Tree Grate / Tree Lawn
travelway Pavement Width
travelway Pavement Width
30’ max
B
21’ max
B
Travel Lane
11’ max
C
Travel Lane
10.5’ max
C
Parking Lane
8’ max
D
Parking Lane
N/A
Traffic Lanes
2 lanes
Traffic Lanes
2 lanes
streetscape Cycle Track
streetscape Planter
N/A
4’ min
D
Planter
5’ min
E
Tree Spacing
30’ o.c. avg
Tree Spacing
30’ o.c. avg
Sidewalk
6’ min
E
Sidewalk
5’ / 11’ min
F
B:32
San Marcos Design Manual Amended: March 16, 2021
Made with FlippingBook flipbook maker