San Marcos Design Manual (March 16, 2021)
B A PP E ND I X
Streetscape Improvements
U. Hutchison St (Guadalupe to N CM Allen) (60-80’)-(50-56’)
general Right of Way
60 - 80’
A
Motorist Operating Speed 25 mph Walkway Sidewalk Bikeway
Bike Lane / Shared Travel Lane Marked angle (south side); Parallel (north side)
Parking
Planting
Tree Grate/ Tree Lawn
travelway Pavement Width
50 - 56’ max
B
Travel Lane
10.5 - 11’ max
C
Parking Lane
17’ max; 8’ max
D
Traffic Lanes
2 lanes
streetscape
4’; Shared Travel Lane (south side)
Cycle Track
E
Planter
5’ min
F
Tree Spacing
30’ o.c. avg
Sidewalk
10 - 13.5’ min
G
B:31
Amended: March 16, 2021 San Marcos Design Manual
Made with FlippingBook flipbook maker