San Marcos Design Manual (March 16, 2021)
B
A PP E ND I X
Streetscape Improvements
S. Harvey St (North to San Antonio St) 60’-32’
T. Hutchison St (North to Guadalupe) 60’-40’
general Right of Way
general Right of Way
60’
60’
A
A
Motorist Operating Speed 25 mph Walkway Sidewalk Bikeway N/A
Motorist Operating Speed 25 mph Walkway Sidewalk Bikeway
Shared Travel Lane
Parallel (both sides undesignated)
Parallel (both sides) *Angled where space permits
Parking
Parking
Planting
Continuous
Planting
Tree Grate
travelway Pavement Width
travelway Pavement Width
32’ max
40’ max
B
B
Travel Lane
N/A
Travel Lane
10.5’ - 11’ max
C
C
Parking Lane
N/A
Parking Lane
8’ max
D
D
Traffic Lanes
2 lanes
Traffic Lanes
2 lanes
streetscape Planter
streetscape Planter
7’ min
4’ min
E
E
Tree Spacing
30’ o.c. avg
Tree Spacing
30’ o.c. avg
Sidewalk
6’ min
Sidewalk
10 - 12’ min
F
F
B:30
San Marcos Design Manual Amended: March 16, 2021
Made with FlippingBook flipbook maker