San Marcos Design Manual (March 16, 2021)
B A PP E ND I X
Streetscape Improvements
X. Lindsey St (40-44’)-30’
Y. Centre St (56-75’)-30’
general Right of Way
general Right of Way
40’ - 44’
A
56’-75’
A
Motorist Operating Speed 25 mph Walkway Sidewalk Bikeway N/A Parking
Motorist Operating Speed 25 mph Walkway Sidewalk Bikeway N/A Parking
Parallel (south side)
Parallel (north side)
Planting
Tree Grate / Tree Lawn
Planting
Tree Grate / Tree Lawn
travelway Pavement Width
travelway Pavement Width
30’ max
B
30’ max
B
Travel Lane
10.5’ - 11’ max
C
Travel Lane
10.5’ - 11’ max
C
Parking Lane
8’ max
D
Parking Lane
8’ max
D
Traffic Lanes
2 lanes
Traffic Lanes
2 lanes
streetscape Cycle Track
streetscape Cycle Track
N/A
N/A
Planter
4’ (one side)
E
Planter
7’ min
E
Tree Spacing
30’ o.c. avg
Tree Spacing
30’ o.c.
5’ (north side) / 6’ min (south side)
5’ min (south side) / 7’ min (north side)
Sidewalk
F
Sidewalk
F
B:33
Amended: March 16, 2021 San Marcos Design Manual
Made with FlippingBook flipbook maker