Vision San Marcos Comprehensive Plan
EX IST ING CONDI T IONS ROADWAYS
assembly serves as a tool to guide the land
development process and ensure that any new
roadway construction is consistent with other
The current roadway network contains
TRANSPORTAT ION
transportation facilities and the surrounding
approximately 463 centerline miles of roads.
land uses, whether existing
• EXISTING CONDITIONS
This value accounts for both city, county
or proposed. TRAFFIC SIGNALS
and state maintained roadways. The Texas
• TRAVEL DEMAND MODEL
Department of Transportation (TxDOT) oversees
There are currently 51 traffic signals in
the maintenance and operations of roads
• PROJECTIONS
operation throughout the city. Nearly one-
designated as interstates and state highways.
quarter (25 percent) of these traffic signals are
The remaining roadway network is the
• FIGURES APPENDIX:
located within the downtown area and are
responsibility of Hays County in the ETJ and the
Thoroughfare Assembly
synchronized
City of San Marcos within city limits. Depending
Bridges
on the type of roadway, the number of lanes
Traffic Signals
range from 2-lane minor streets to the 6-lane
Public Transportation
interstate highway. Thoroughfare Assembly
Bicycle Infrastructure
is a way to categorize roads based on the
Sidewalk Inventory
surrounding land uses, the type of access they
provide to properties and the types of vehicles
that are meant to travel there. The thoroughfare
Made with FlippingBook Online newsletter