San Marcos Design Manual (March 16, 2021)
B
A PP E ND I X
Streetscape Improvements
C. Jackson Ln (29-60’)-24’
D. Long St 60’-34’
general Right of Way
general Right of Way
29’ (proposed 60’ ROW)
50’
A
A
Motorist Operating Speed 30 mph Walkway Sidewalk Bikeway
Motorist Operating Speed 30 mph Walkway Sidewalk Bikeway N/A Parking
Shared Travel Lane
Parking
N/A
Parallel (south side)
Planting
Tree Grate / Tree Lawn
Planting
Tree Grate / Tree Lawn
travelway Pavement Width
travelway Pavement Width
24’ max
34’ max
B
B
Travel Lane
12’ max
Travel Lane
13’ max
C
C
Parking Lane
N/A
Parking Lane
8’ max
D
Traffic Lanes
2 lanes
Traffic Lanes
2 lanes
streetscape Planter
streetscape Planter
7’ min
D
4’ min
E
Tree Spacing
30’ o.c. avg
Tree Spacing
30’ o.c. avg
Sidewalk
6’ min
E
Sidewalk
6’ min
F
B:42
San Marcos Design Manual Amended: March 16, 2021
Made with FlippingBook flipbook maker