San Marcos Design Manual (March 16, 2021)
B A PP E ND I X
Streetscape Improvements
A. Thorpe Ln (60-76’)-44’
B. Springtown Way 60’-38’
general Right of Way
general Right of Way
60-76’
60’
A
A
Motorist Operating Speed 30 mph Walkway Sidewalk Bikeway
Motorist Operating Speed 25 mph Walkway Sidewalk Bikeway
Bike Lane (both sides)
Bike Lane (both sides)
Parking
N/A
Parking
N/A
Planting
Tree Grate / Tree Lawn
Planting
Tree Grate / Tree Lawn
travelway Pavement Width
travelway Pavement Width
44’ max
38’ max
B
B
Travel Lane
11’ max
Travel Lane
10.5’ max
C
C
Parking Lane
N/A
Turn Lane
12’ max
D
Turn Lane
12’ max
D
Parking Lane
N/A
Traffic Lanes
2 lanes with Center Turn
Traffic Lanes
2 lanes with Center Turn
streetscape Cycle Track
streetscape Cycle Track
5’ min
4.5’ min
E
E
Planter
4’ min
Planter
4’ min
F
F
Tree Spacing
30’ o.c. avg
Tree Spacing
30’ o.c. avg
Sidewalk
6’ min
Sidewalk
6’ min
G
G
B:41
Amended: March 16, 2021 San Marcos Design Manual
Made with FlippingBook flipbook maker