San Marcos Design Manual (March 16, 2021)
B A PP E ND I X
Streetscape Improvements
P. Edward Gary St (MLK to San Antonio) 83’-(48-57’)
general Right of Way
83’ - 86
A
Motorist Operating Speed 25 mph Walkway Sidewalk Bikeway
Bike Lane (both sides)
Parking
Parallel (both sides)
Planting
Tree Grate
travelway Pavement Width
48’ - 57’ max
B
Travel Lane
10.5 - 11’ max
C
Parking Lane
8’ max
D
Traffic Lanes
2 lanes
streetscape Bike Lane
5’ min
E
Planter
7’ min
F
Tree Spacing
30’ o.c. avg
Sidewalk
10-11’ min
G
B:27
Amended: March 16, 2021 San Marcos Design Manual
Made with FlippingBook flipbook maker