San Marcos Design Manual (March 16, 2021)
B
A PP E ND I X
Streetscape Improvements
Q. CM Allen Pkwy (University to San Antonio) 107’-68’
J
J
general Right of Way
Tree Spacing
30’ o.c. avg
107’
A
Sidewalk
8’ min
J
Motorist Operating Speed 25 mph Walkway
Note: Potential reconfiguration of parking to traffic lanes
Sidewalk / Multi-Use path
Bikeway
Multi-Use Path
Parking
Parallel (both sides)
Planting
Tree Lawn/ Median
travelway Pavement Width
65’
B
Median
6.5’ - 20’ min (Planted)
C
Travel Lane
10.5’ min
D
Parking Lane
9’
E
Turn Lane
13.5’ min (staggered)
F
Parking Buffer
3’ min
G
Traffic Lanes
2 lanes; Staggered Center Turn
streetscape Cycle Track / Multi-Use
15’ min (east side)
H
Planter
7.5’ min, 3’ buffer
I
B:28
San Marcos Design Manual Amended: March 16, 2021
Made with FlippingBook flipbook maker