Vision San Marcos Comprehensive Plan
WASTEWATER
WATER SUPPLY
Many recommendations to improve and
address these shortfalls are outlined in
The City of San Marcos tracks the
The City of San Marcos’ current water
the Parks, Recreation & Open Space
maintenance completed on wastewater
supply is anticipated to be adequate
Master Plan. Vision San Marcos: A
facilities. This allows the city to
through the 2024-2031 timeframe
River Runs Through Us supports these
determine where infrastructure may be
depending on consumption and drought
recommendations and encourages
failing and in need of replacement as
conditions. Basic water supply issues
the Parks and Recreation Department
well as the costs associated with the
include the lack of water to serve future
to follow through with reviewing and
repairs. Based on data from 2005-
populations, competition for resources,
updating this plan at five year intervals
2011, there are four “hot spots” where
and cost. The costs of purchasing
to ensure the public desire as well as
the majority of wastewater maintenance
future water supplies today are borne
need is met.
has taken place. These areas, along
by existing, not future customers. Two
with the costs and labor hours
options for obtaining water for future
associated with each, are indicated on
residents are already in the current
the Wastewater Collection Map.
Water Master Plan. These are water
conservation and working with the
Hays Caldwell Public Utility Agency for
groundwater from the Carrizo-Wilcox
Aquifer. Other suggestions include the
Guadalupe-Blanco River Authority Mid-
Basin Project and / or not acquiring
Vision San Marcos: A River Runs Through Us pg 97
Made with FlippingBook Online newsletter