San Marcos Development Code (effective Nov. 3, 2021)
6 C H A P T E R
Environmental Regulations
1. WQV shall be retained or detained on-site. Drawdown time shall be 48-hours. 2. The 90th percentile rainfall event for San Marcos is 1.6 inches 3. The 85th percentile rainfall event for San Marcos is 1.25 inches. B. Stormwater Quality Treatment. Required stormwater quality treatment levels for different locations are listed in the table below and represents the percent reduction in the increased total suspended solids load.
C. Stream Protection Volume and Stormwater Treatment Level Table
Table 6.1 Stream Protection Volume and Stormwater treatment level table
Stormwater Treatment Level
SPV amount Design Rainfall
Location
Edwards Aquifer Recharge Zone Edwards Aquifer Transition Zone and Contributing Zone within the Transition Zone San Marcos River Protection Zone
1.60”
89%
1.25”
85%
1.25”
80%
San Marcos River Corridor
1.60”
89%
Figure 6.2 Environmental Protection zones
¬« 21
O
l d
R a
n c
h
R o a d 12
N LBJ Dr
s Dr
Aquarena Spring
D r
m
o
s
e s
S
W
N Guadalupe St
W
W
o n
d e
s S t
r W o r l d D r
E H o p k i n
S Guadalupe St S LBJ Dr
W Hopkins St
FM 1984
H w y
Wonder World Dr
r o p
ld B a s t
¬« 80
O
§¨¦ 35
Rd
Hunter
W M c C a r t y
L n
Clovis Barker Rd
San Marcos River Protection Zone San Marcos River Corridor
Edwards Aquifer Recharge Zone Edwards Aquifer Transition Zone Edwards Aquifer Contributing Zone within the Transition Zone
E McCarty Ln
Redwood Rd
¬« 123
St a
ples Rd
Stormwater Management District
0
1,250
2,500
5,000
7,500
Feet N
S Old Bastrop Hwy
6:7
Amended: November 3, 2021 San Marcos Development Code
Made with FlippingBook. PDF to flipbook with ease