1. WQV shall be retained or detained on-site. Drawdown time shall be 48-hours. 2. The 90th percentile rainfall event for San Marcos is 1.6 inches 3. The 85th percentile rainfall event for San Marcos is 1.25 inches. B. Water Quality Volume Treatment. Required water quality volume treatment level for different locations is listed in the table below and represents the percent reduction in the increased total suspeneded solids load.
C. Water Quality Volume and Treatment Level Table
Table 6.1 water Quality Volume and treatment level table
WQV amount Design Rainfall
WQV Treatment Level
Location
Edwards Aquifer Recharge Zone Edwards Aquifer Transition Zone and Contributing Zone within the Transition Zone San Marcos River Protection Zone
1.60”
89%
1.25”
85%
1.25”
80%
San Marcos River Corridor
1.60”
89%
Figure 6.2 Environmental Protection zones
¬ « 21
O l d R a n c h R o a d 12
N LBJ Dr
Aquarena Spring s Dr
W S e s s o m D r
N Guadalupe St
W W o n d e r W o r l d D r
E H o p k i n s S t
S Guadalupe St S LBJ Dr
W Hopkins St
FM 1984
O ld B a s t r o p H w y
WonderWorld Dr
¬ « 80
§ ¨ ¦ 35
Hunter Rd
W M c C a r t y L n
Clovis Barker Rd
San Marcos River Protection Zone San Marcos River Corridor
EdwardsAquiferRechargeZone EdwardsAquiferTransitionZone EdwardsAquiferContributingZonewithin theTransitionZone
E McCarty Ln
Redwood Rd
¬ « 123
St a ples Rd
Stormwater Management District
0
1,250
2,500
5,000
7,500
N
S Old Bastrop Hwy
Feet
6:7
Amended: September 1, 2020 San Marcos Development Code
Made with FlippingBook flipbook maker