San Marcos Design Manual (March 16, 2021)
B A PP E ND I X
Streetscape Improvements
K. North St (Hutchison St to Hopkins St) 56’-32’
L. North St (Hopkins St to Harvey St) 46’-26’
general Right of Way
general Right of Way
56’
46’
A
A
Motorist Operating Speed 30 mph Walkway Sidewalk Bikeway N/A
Motorist Operating Speed 30 mph Walkway Sidewalk Bikeway
Shared Travel Lane Parallel (one side undesignated Tree Grate/ Tree Lawn
Parallel (both sides undesignated) Tree Grate/ Tree Lawn
Parking
Parking
Planting
Planting
travelway Pavement Width
travelway Pavement Width
32’ max
26- 29’ max
B
B
Yield Lane
Undesignated (Yield)
Yield Lane
N/A
C
C
Parking Lane
Undesignated
Parking Lane
N/A
D
D
Traffic Lanes
2 lanes
Traffic Lanes
2 lanes
streetscape Planter
streetscape Planter
4 - 6’ min
4’ min
E
E
Tree Spacing
30’ o.c. avg
Tree Spacing
30’ o.c. avg
Sidewalk
6 - 10’ min
Sidewalk
6’ min
F
F
B:23
Amended: March 16, 2021 San Marcos Design Manual
Made with FlippingBook flipbook maker