San Marcos Design Manual (March 16, 2021)
B A PP E ND I X
Streetscape Improvements
H. Grove St (Hull to Guadalupe; LBJ to McKie) (55-56’)-(34 36’)
G. Grove St (Guadalupe to LBJ) 55’-36’
general Right of Way
general Right of Way
55’ - 56’
55’ - 63’
A
A
Motorist Operating Speed 25 mph Walkway Sidewalk Bikeway
Motorist Operating Speed 25 mph Walkway Sidewalk Bikeway
Shared Travel Lane
Bike Lane (2-way north side)
Parking
Parallel (both sides)
Parking
Parallel (south side)
Planting
Tree Grate/ Tree Lawn
Planting
Tree Grate/ Tree Lawn
travelway Pavement Width
travelway Pavement Width
34 - 36’ max
30 - 34’ max
B
B
Travel Lane
10.5’ max
Travel Lane
11 - 13’ max
C
C
Parking Lane
7.5 max
Parking Lane
8’ max (south side)
D
D
Traffic Lanes
2 lanes
Traffic Lanes
2 lanes (one way)
streetscape Planter
streetscape Bike Lane
4’ min
10’ (5’ each lane) min
E
E
Tree Spacing
30’ o.c. avg
Planter
4’ min
F
Sidewalk
6’ max
F
Tree Spacing
30’ o.c. avg
Sidewalk
6’ min
G
Buffer
3’ min
H
B:21
Amended: March 16, 2021 San Marcos Design Manual
Made with FlippingBook flipbook maker