San Marcos Design Manual (March 16, 2021)
B
A PP E ND I X
Streetscape Improvements
E. Cheatham St (Guadalupe to LBJ) (42’-55’)-30’
F. Cheatham St (S LBJ to CM Allen) 60’-(40-44’)
general Right of Way
general Right of Way
42’ - 55’
60’
A
A
Motorist Operating Speed 20 mph Walkway Sidewalk Bikeway
Motorist Operating Speed 30 mph Walkway Sidewalk Bikeway Bike Lane Parking
Shared Travel Lane
Parking
Parallel (south side)
Parallel (south side)
Planting
Tree Grate/ Tree Lawn
Planting
Tree Grate/ Tree Lawn
travelway Pavement Width
travelway Pavement Width
30’ max
40 - 44’ max
B
B
Travel Lane
11’ max
Travel Lane
11-12’ max
C
C
Parking Lane
8’ max (south side)
Parking Lane
8’ max (south side)
D
D
Traffic Lanes
2 lanes
Traffic Lanes
2 lanes
streetscape Planter Tree Spacing
streetscape Bike Lane
4-7’ min
5’-6’ min
E
30’ o.c. avg
Planter
4’ min
F
Sidewalk
6’ min
E
Tree Spacing
30’ o.c. avg
Sidewalk
6’ min
G
B:20
San Marcos Design Manual Amended: March 16, 2021
Made with FlippingBook flipbook maker