San Marcos Design Manual (March 16, 2021)
B A PP E ND I X
Streetscape Improvements
B. University Dr (CM Allen to Guadalupe St) (56-58’)-40’
A. Pat Garrison St 46’-32’
general Right of Way
general Right of Way
46’
56’ - 58’
A
A
Motorist Operating Speed 25 mph Walkway Sidewalk Bikeway N/A Parking
Motorist Operating Speed 35 mph Walkway Sidewalk Bikeway
Shared Travel Lane
Parallel (north side)
Parking
Parallel (south side)
Planting
Tree Grate
Planting
Tree Grate/ Tree Lawn
travelway Pavement Width
travelway Pavement Width
33’
40’ max
B
B
Travel Lane
10.5 - 11’
Travel Lane
10.5’ max; 11’ max turn lane
C
C
Parking Lane
8’ max
Parking Lane
8’ (south side)
D
D
Traffic Lanes
2 lanes
Traffic Lanes
3 lanes (middle turn lane)
travelway Planter
travelway Planter
4’ min
4’ min
E
E
Tree Spacing
30’ o.c. avg
Tree Spacing
30’ o.c. avg
Sidewalk
6’ min
Sidewalk
6’ - 10’ min
F
F
B:17
Amended: March 16, 2021 San Marcos Design Manual
Made with FlippingBook flipbook maker