San Marcos Design Manual (March 16, 2021)
B A PP E ND I X
Streetscape Improvements
M. McCoy Cir - 76’-52’
N. Northgate St - 53’-33’
general Right of Way
general Right of Way
76’
53’
A
A
Motorist Operating Speed 30 mph Walkway Sidewalk Bikeway
Motorist Operating Speed 30 mph Walkway Sidewalk Bikeway
Bike Lane (both sides)
Shared Travel Lane
Parking
N/A
Parking
Parallel (one side)
Planting
Tree Grate / Tree Lawn
Planting
Tree Grate / Tree Lawn
travelway Pavement Width
travelway Pavement Width
52’ max
33’ max
B
B
Travel Lane
11’ max
Travel Lane
12’ max
C
C
Turn Lane
12’ max
Parking Lane
9’ max (one side)
D
D
Parking Lane
N/A
Traffic Lanes
2 lanes
Traffic Lanes
2 lanes with Center Turn
streetscape Planter
7.5’ min
E
streetscape Cycle Track
7’ min
E
Tree Spacing
30’ o.c. avg
Planter
4’ min
Sidewalk
6’ min
F
F
Tree Spacing
30’ o.c. avg
Sidewalk
6’ min
G
B:47
Amended: March 16, 2021 San Marcos Design Manual
Made with FlippingBook flipbook maker