San Marcos Design Manual (March 16, 2021)
B A PP E ND I X
Streetscape Improvements
I. Uhland Rd - 65’-21’
J. River Rd - 60’-21’
general Right of Way
general Right of Way
65’
60’
A
A
Motorist Operating Speed 30 mph Walkway Sidewalk Bikeway
Motorist Operating Speed 30 mph Walkway Sidewalk Bikeway
Shared Travel Lane
Shared Travel Lane
Parking
N/A
Parking
N/A
Planting
Tree Grate / Tree Lawn
Planting
Tree Grate / Tree Lawn
travelway Pavement Width
travelway Pavement Width
21’ max
21’ max
B
B
Travel Lane
10.5’ max
Travel Lane
10.5’ max
C
C
Parking Lane
N/A
Parking Lane
N/A
Traffic Lanes
2 lanes
Traffic Lanes
2 lanes
streetscape Planter
streetscape Planter
7’ min
7’ min
D
D
Tree Spacing
30’ o.c. avg
Tree Spacing
30’ o.c. avg
Sidewalk
6’ min
Sidewalk
6’ min
E
E
B:45
Amended: March 16, 2021 San Marcos Design Manual
Made with FlippingBook flipbook maker