San Marcos Design Manual (March 16, 2021)
B A PP E ND I X
Streetscape Improvements
AC. Armstrong St 44’-29’
AD. Nicola Alley (20-30’)-30’
general Right of Way
general Right of Way
20’ - 30’
A
44’
A
Motorist Operating Speed 25 mph Walkway
Motorist Operating Speed 25 mph Walkway Sidewalk Bikeway N/A Parking
Shared Right-of-Way
Bikeway
Shared Right-of-Way
Parking
Parallel (alternating)
Parallel (north side)
Planting
Planters (Alternating)
Tree Grate / Tree lawn (north side)
Planting
travelway Pavement Width
30’ max
B
travelway Pavement Width
Travel Lane
14’ max
C
29’ max
B
Parking Lane
8’ max
D
Travel Lane
10.5 max
C
Traffic Lanes
Shared Right-of-Way
Parking Lane
8’ max
D
streetscape Cycle Track
Traffic Lanes
2 lanes
Shared Travel Lane
E
streetscape Cycle Track
Sidewalk
Shared Right-of-Way
F
N/A
Planter
4’ min
E
Tree Spacing
30’ o.c. avg
6’ min (north side) / 5’ min (south side)
Sidewalk
F
B:37
Amended: March 16, 2021 San Marcos Design Manual
Made with FlippingBook flipbook maker