San Marcos Design Manual (March 16, 2021)

B A PP E ND I X

Streetscape Improvements

R. CM Allen Pkwy (San Antonio to Cheatham) 86’-42’

general Right of Way

86’

A

Motorist Operating Speed 35 mph Walkway SIdewalk Bikeway

Bike Lane (both sides)

Parking

Parallel (east side)

Planting

Tree Lawn

travelway Pavement Width

42’ max

B

Travel Lane

12’ max

C

Parking Lane

8’ max

D

Traffic Lanes

2 lanes

streetscape Cycle Track

6’ min

E

Planter

8-10’ min

F

Tree Spacing

30’ o.c. avg

Sidewalk

12’ (both sides)

G

B:29

Amended: March 16, 2021 San Marcos Design Manual

Made with FlippingBook flipbook maker