San Marcos Design Manual (March 16, 2021)
B
A PP E ND I X
Streetscape Improvements
M. Comanche St (North of Hutchison) 58’-38’
N. Fredricksburg St (Lindsey to Hutchison St) 40’-42’ (Hutchison to MLK Dr) 21’-24’
general Right of Way
general Right of Way
58’
40’ - 42’ / 21’-24’
A
A
Motorist Operating Speed 30 mph Walkway Sidewalk Bikeway Bike Lane Parking
Motorist Operating Speed 30 mph Walkway Sidewalk Bikeway Shared ROW Parking N/A / Alternating Planting Tree Grate/ Tree Lawn travelway Pavement Width 21’ - 24’ max
East side at 7’ marked
Planting
Tree Grate/ Tree Lawn
travelway Pavement Width
25’ min - 38’ max
B
B
Travel Lane
10.5’ max
Travel Lane
10.5’ - 12’ max
C
C
Parking Lane
N/A
Parking Lane
7’ max
D
Traffic Lanes
2 lanes / Shared ROW
Traffic Lanes
2 lanes
streetscape Planter
streetscape Bike Lane
4’ min / Shared Travel Lane
D
5’ min
E
Tree Spacing
30’ o.c. avg
Planter
4’ min
F
Sidewalk
6’ min / Shared ROW
E
Tree Spacing
30’ o.c. avg
Sidewalk
6’ min
G
B:24
San Marcos Design Manual Amended: March 16, 2021
Made with FlippingBook flipbook maker