ORD-2025-01 Design Manual Effective 2025.1.21
B APPENDIX
Streetscape Improvements
R. CM Allen Pkwy (San Antonio to Cheatham) 86’-42’
general Right of Way
86’
A
Motorist Operating Speed 35 mph Walkway SIdewalk Bikeway
Bike Lane (both sides)
Parking
Parallel (east side)
Planting
Tree Lawn
travelway Pavement Width
42’ max
B
Travel Lane
12’ max
C
Parking Lane
8’ max
D
Traffic Lanes
2 lanes
streetscape Cycle Track
6’ min
E
Planter
8-10’ min
F
Tree Spacing
30’ o.c. avg
Sidewalk
12’ (both sides)
G
Amended: January 21, 2025 San Marcos Design Manual
B:29
Made with FlippingBook Learn more on our blog