ORD-2025-01 Design Manual Effective 2025.1.21

B APPENDIX

Streetscape Improvements

P. Edward Gary St (MLK to San Antonio) 83’-(48-57’)

general Right of Way

83’ - 86

A

Motorist Operating Speed 25 mph Walkway Sidewalk Bikeway

Bike Lane (both sides)

Parking

Parallel (both sides)

Planting

Tree Grate

travelway Pavement Width

48’ - 57’ max

B

Travel Lane

10.5 - 11’ max

C

Parking Lane

8’ max

D

Traffic Lanes

2 lanes

streetscape Bike Lane

5’ min

E

Planter

7’ min

F

Tree Spacing

30’ o.c. avg

Sidewalk

10-11’ min

G

Amended: January 21, 2025 San Marcos Design Manual

B:27

Made with FlippingBook Learn more on our blog