ORD-2021-16 Design Manual
B
A PP E ND I X
Streetscape Improvements
O. Edward Gary St (University to San Antonio) 80’-(52’-58’)
general Right of Way
80’
A
Motorist Operating Speed 25 mph Walkway Sidewalk Bikeway
Shared Travel Lane
Parking
Angled (both sides)
Planting
Tree Grate
travelway Pavement Width
52’ - 55’ max
B
Travel Lane
10.5’ - 12’ max
C
Parking Lane
15.5’ - 17’ max
D
Traffic Lanes
2 lanes
streetscape Planter
4’ min
E
Tree Spacing
30’ o.c. avg
Sidewalk
10’ min
F
B:26
San Marcos Design Manual
Made with FlippingBook - Online catalogs